Case studies-Student accommodation and social spaces
MANCHESTER METROPOLITAN UNIVERSITY. CAVENDISH HOUSE
Supply and fit 205 bedrooms and 25 kitchens to an awkward building in Central Manchester
We overcame logistical challenges to deliver a refurbishment program in batches of 12 between Easter and Summer.
KEY FEATURES
Cavendish House posed configuration challenges with pipe locations and ceiling heights varying from room to room. We overcame this by creating an onsite workshop to custom-fit each bedroom as it was being installed
LONDON SCHOOL OF ECONOMICS.
ROSEBERY HALL
Bedroom refresh program
The client was looking to modernise the bedrooms to give improved spaces for the occupants as well as a more up-to-date look and feel.
KEY FEATURES
Our service included full surveying of bedrooms and liaison with the manufacturer to ensure ease of installation
IQ STUDENT ACCOMMODATION.
ALDGATE, LONDON
Manufacture, delivery, and installation of 90+ bedrooms.
We were able to hit the tight deadlines by working closely with the main contractor to develop an implementation program that enabled call-off of stock as the building process evolved.
KEY FEATURES
Our flexibility in manufacturing was able to cope with a colour change to half of the bedrooms in the middle of the production period. Images shown are the Paris Gardens site, which has an identical specification